Location

AgRail is located near the southern end of the Union Pacific rail yard in Bloomington, Illinois. This allows us to channel semi traffic along Illinois Route 9 with minimal use of side streets. Because of weight restrictions, a certain route to AgRail is used so that semis will remain on the class three truck route. At all times remain on this route.

From the West

  1. Take Illinois Route 9 east into Bloomington.
  2. Follow the signs for Route 9 until you come to a bridge, but do not cross it.
  3. Turn left and go one block north on Morris (this is the last left turn before the bridge)
  4. Turn right and go one block on Chestnut, following the curve.
  5. Take the first gravel lane you see and pull onto the scale with your truck facing to the west.

From the East

  1. Take Illinois Route 9 west into Bloomington.
  2. Follow the signs for Route 9 until you go over the rail yard bridge.
  3. Turn right and go one block north on Morris (this is the first right turn after the bridge)
  4. Turn right and go one block on Chestnut, following the curve.
  5. Take the first gravel lane you see and pull onto the scale with your truck facing to the west.

Map to facility